Calculator

Calculate your quote

We can help estimate your needs.
Project Info Project Details Measurements Project Comments

Please enter all fields correctly so that we can give you an accurate calculation.

Estimated cost$104.16

CONGRATULATIONS!

Your project completion time will be reduced by, on average, 3 days per storey with Vapor Lock.

The calculation displayed on screen is an estimation only and is based on your inputs, therefore will require a written confirmation by a certified Biorok sales consultant.

Want a more specific calculation?

We just need a few more details.

$
You can drag and drop the pin as required to select your project site.

We need to make sure you're a human.

Please enter your name and mobile phone number, so that we can send you an SMS with a confirmation code.
You can read about our privacy policy here.

We've just sent you an SMS message.

This might take a few moments to arrive. Enter the confirmation code in the box below.

Well, your project will benefit most from a L order of Vapor Lock.

32,112.41 Estimated Cost
Based on an average 5-storey project.
15 days of time saved
on-site waiting for concrete to set.
1000L of Vapor Lock required
Assuming m³ of concrete.

On average, Vapor Lock causes concrete to dry up to 3 days faster when compared to conventional waterproofing methods.

Something to think about?

Enter your email address, and we'll send you an email with a PDF version of the above calculations.

Email me

I've made up my mind!

Pick up the phone and give us a call if you're ready to discuss your options. We're open Mon - Fri, 7am - 6pm.

Call us on 1300 503 929 OR Call me

Please contact our sales team to discuss your requirments for SHIELDWALL 39™ or further information on ad mixtures.

Phone: 1300 503 929
Email: sales@biorok.com.au